
← Back to News
Case study: modernising a legacy ERP for a European manufacturer
Over the past nine months we partnered with a mid-market industrial manufacturer to replace a 15-year-old ERP front end with a modern, modular web platform — without disrupting production.
The constraints
The legacy system controlled order intake, shop-floor scheduling, and dispatch. Downtime windows were measured in minutes, and the existing data model could not be touched until the new UI was proven.
How we delivered
- A strangler-fig rollout that ran the old and new front ends side by side behind a reverse proxy.
- A read-through caching layer that absorbed traffic spikes during the transition.
- Automated regression tests against the legacy database so every release could be verified end-to-end.
The result
- ~40% reduction in order-entry time.
- Zero unplanned downtime during the cut-over.
- A foundation the client now extends with new modules every quarter.
Read more about our manufacturing work on the industries page.